User's Manual
1. Check the position of Main body & Sensors1. Check the position of Main body & Sensors
-- Considering the position of main power & telephone lineConsidering the position of main power & telephone line
2. Unpacking the SpeedCop 20002. Unpacking the SpeedCop 2000
3. Connecting the telephone line and the power to the Main Body3. Connecting the telephone line and the power to the Main Body
-- Main Power : for DC 9V(adapter)Main Power : for DC 9V(adapter)
4. Input the telephone numbers, set up sensors and remote 4. Input the telephone numbers, set up sensors and remote
controller.controller.
5. Connecting each sensors to input & output terminal5. Connecting each sensors to input & output terminal
-- ex : Gas detector, siren, wire sensor, etc.(Picture 2)ex : Gas detector, siren, wire sensor, etc.(Picture 2)
6. Re6. Re-- checking input result and test operationchecking input result and test operation
7. Fixing and hanging main body & each sensors7. Fixing and hanging main body & each sensors
Installation Completed
Installation Completed
Installation Guide- Order of installation
SpeedCop
TM
2000
9
Dynamic Technology Inc.