Integration Manual

7.2 FCC
This device complies with Part 15.247 of the FCC rules. Operation is subject to the following
two conditions:
1) This device must accept any interference and
2) This device must accept any interference received including interference that may
cause undesired operation
Changes or modifications not expressly approved by Dynamic Load Monitoring Ltd. could
void the user’s authority to operate the equipment.
Additional FCC requirements and testing when installing in another host:
Manufacturers integrating the Link Module into other devices should note the following:
The device is compliant with part 15.247 of Title 47 of the FCC rules. If the Link
Module is integrated into a new host product, the final host product still requires Part
15 Subpart B compliance testing with the modular transmitter installed.
If the link module is integrated into a new host product, the should follow FCC KDB
996369 D04 Module Integration Guide. The link unit may be placed into continuous
transmit or hopping modes using test firmware, a unit containing this firmware can be
supplied from Dynamic Load Monitoring (UK) Ltd via the above contact details.