Integration Manual
5.0 SERVICE AND REPAIR
The OEM is responsible for generating suitable service and repair instructions
applicable to their application. If there are any issues surrounding firmware operation
the unit should be returned to Dynamic Load Monitoring (UK) Ltd for inspection.
General points of consideration should be:
1) Prevention of water ingress onto the PCB
2) Prevention of dust ingress onto the PCB
3) Prevention of excessive heat to the batteries or PCB
If the TL-3.0 is no longer required it should be disposed of correctly, including
batteries, and not placed into land fill.