Installation Guide

10
7. Assemble the reector panel (A) onto the
ame screen (B):
WARNING: Be sure to remove the protective
lm from the reector panel (A) before
assembly.
Screw the three reector spacers (CC) on
the ame screen (B). Put three washers Φ6
(BB) onto the top of the reector spacers
(CC). Then put the reector panel (A) onto
the reector spacers (CC), securing them
with three washers Φ6 (BB) and three M8
wing nuts (AA).
8. Carefully install the glass tube (C) by lifting
it up and inserting it through the center hole
in the ame screen (B). Ensure the black
silicone ring (F) is attached to the lower
edge of the glass tube (C) as illustrated.
Slide the glass tube (C) through the hole of
the lower plate cover and onto the middle
plate on the control box assembly (I).
Check and ensure that the glass tube (C)
is positioned properly and is completely
covering the center hole of the middle plate
on the control box assembly (I).
ASSEMBLY INSTRUCTIONS
M8 Wing nut
Washer Φ6
BLACK SILICONE
RING
Reector
spacer
WARNING! The black
silicone ring must be in place
prior to operating the heater.
x 3
x 3
x 6
Hardware Used
AA
BB
CC
AA
BB
CC
7
8
A
B
B
I
C
F