Specifications
EC-Series Flood Lamps for UVCS-Series Conveyors 9
8. Record the serial number of the unit and the Hour Meter reading in the Bulb history record.
9. Replace the Lamp/Reflector Assembly Housing on the Conveyor Cradle.
10. Secure the thumbscrew when the Lamp/Reflector Assembly Housing is at the proper height.
11. Reconnect the Power Cord to the appropriate power source.
12. Turn the Conveyor on by turning the Power Switch to the on position.
13. Allow at least 5 minutes for the Bulb to reach operating temperature before using.
NOTE: If the Bulb does not ignite, refer to the Troubleshooting Section of this manual.
FUSE REPLACEMENT PROCEDURE
The EC-Series 400 Watt Power Supply utilizes two Line-Input Fuses. These Fuses are external and are located in
the Power Cord Receptacle at the rear of the Power Supply Housing. The Fuses are 6.25 Amp, slow-blow Fuses.
WARNING: Electrical shock hazard. Exercise extreme care when replacing Fuses. Make sure only qualified
personnel perform Fuse replacement and that all Power Switches are off and the Power Cord is unplugged.
Replacing External Fuses:
1. Turn the Power Switch on the Power Supply off.
2. Unplug the Power Cord from the electrical source.
3. Unplug the Power Cord from the Power Cord Receptacle at the rear of the Power Supply Housing.
4. Place a small, flat-blade screwdriver into the notch at the top of the Plug Recess and pull the Fuse Cover
downwards approximately 70°. The Fuse Retainer should be exposed and should be removed by pulling
it straight out (see Figures 12-14).
Figure 12-14. Replacing Fuses in the Power Supply
5. Slide out the blown Fuses and replace with new 6.25 Amp, slow-blow Fuses.
CAUTION: It is important to replace this Fuse with the same 6.25 Amp rated, slow-blow type Fuse.
6. Slide the Fuse Cover back into the Receptacle until it is fully seated, then rotate the cover upward until it
latches.
7. Install the Power Cord and connect it to the electrical power source.
8. Turn the Power Switch on.
Plug Recess
Fuse Cover










