Installation Guide

41-3/4”
1-3/16”
3-15/16”
31-1/8”
Before starting the installation :
1. Verify the cener of your faucet and rough in your supply lines accordingly.
2. Water supply lines must be roughed in on 6 centers.
Failure to do so may result in instability when installed directly on top of tile.
6”