
41-3/4”
1-3/16”
3-15/16”
31-1/8”
Before starting the installation :
1. Verify the cener of your faucet and rough in your supply lines accordingly.
2. Water supply lines must be roughed in on 6” centers.
Failure to do so may result in instability when installed directly on top of tile.
6”