Installation Guide

5
Step 5: Install the faucet and hoses through the deck mounting hole. Attach the gasket
(1), metal base clamp (2) and mounting nuts (3) onto the mounting screws (4).
Align the two hoses (5) within the contoured recess of the metal base clamp
before tightening the mounting nuts.
Step 6: Align the faucet to ensure its appropriately positioned. Next, proceed to
tighten the mounting nuts (1) while being mindful not to over-tighten them.
Diagram 6
Diagram 5
Waterfall Faucet Installation Instructions
1
4
5
2
3
1