Installation Guide
Conceal Box Installation Steps
4
www.dyconnfaucet.com
3. Connect hot & cold water form the 
  source to the inlet on conceal box. Wrap 
  the threads on one end of the pipewith 
  pipe tape or teflon tape (not included). 
  Screw the adapters into the female 
  fittings. 
Level
Plate
Screw to ground
Hot
2a. Set the conceal box on the ground, 
  measure with the level provided. 
  Check the level and make sure it is 
  perfectly level with the ground. Then 
  screw the conceal box on the ground. 
2b. Unscrew the plate. Remove the plate. 
  Knock out the level from the back of 
  plate. 
4. Screw the plate on to the bottom of 
  the faucet base with the 4 hex screws 
  provided. Insert the whole faucet body 
  to the conceal box. Insert the inlet 
  pipe to the hot and cold outlet tube of 
  conceal box. 
Hot
Cold
Cold
pipepipe
inlet pipe
Conceal 
box








