Installation Sheet
- 3 -
M965648
4
5
6
INSTALL SUPPLY HOSES
TEST INSTALLED FAUCET
• Make sure both inlet holes on SUPPLY SHANKS (3) are still facing downward.
• Check that the faucet is level and make sure both MOUNTING NUTS (6) are fully threaded against the ESCUTCHEONS (4).
Align faucet body with the DXV logo on sink.
— To fully tighten MOUNTING NUTS (6): turn faucet nut clockwise
while holding SUPPLY SHANKS (3) nut.
• Thread SUPPLY HOSES (7) into SUPPLY SHANK (3) inlet holes.
Tighten with adjustable wrench.
• Connect SUPPLY HOSES (7) to Hot and Cold wall supplies.
Loop SUPPLY HOSES (7) if necessary to avoid kinking.
• With HANDLES in OFF position, turn on water supplies and check all connections for leaks.
• Remove AERATOR
(8)
(8)
with the key provided
with the key provided.
• Operate HANDLES to ush water lines thoroughly.
• Re-install AERATOR
(8)
(8) and tighten.
REALIGN MOUNTING PARTS
6
4
3
INLET
HOLES
DOWN
DXV Logo
7
8
7
3
3
HOT
COLD
WALL SUPPY
DXV SINK INSTALLATION