Installation Sheet

- 3 -
M965648
4
5
6
INSTALL SUPPLY HOSES
TEST INSTALLED FAUCET
Make sure both inlet holes on SUPPLY SHANKS (3) are still facing downward.
• Check that the faucet is level and make sure both MOUNTING NUTS (6) are fully threaded against the ESCUTCHEONS (4).
Align faucet body with the DXV logo on sink.
To fully tighten MOUNTING NUTS (6): turn faucet nut clockwise
while holding SUPPLY SHANKS (3) nut.
• Thread SUPPLY HOSES (7) into SUPPLY SHANK (3) inlet holes.
Tighten with adjustable wrench.
• Connect SUPPLY HOSES (7) to Hot and Cold wall supplies.
Loop SUPPLY HOSES (7) if necessary to avoid kinking.
• With HANDLES in OFF position, turn on water supplies and check all connections for leaks.
• Remove AERATOR
(8)
(8)
with the key provided
with the key provided.
• Operate HANDLES to ush water lines thoroughly.
• Re-install AERATOR
(8)
(8) and tighten.
REALIGN MOUNTING PARTS
6
4
3
INLET
HOLES
DOWN
DXV Logo
7
8
7
3
3
HOT
COLD
WALL SUPPY
DXV SINK INSTALLATION