Installation Sheet

- 2 -
M965827 (4/17)
1
2
3
INSTALL HANDLE
• Remove PLASTER GUARDS and unthread ROUGH-IN NIPPLE (1).
• Inspect that SPOUT NIPPLE O-RINGS (2 & 3) are seated in the grooves of SPOUT NIPPLE (4).
• Thread SPOUT NIPPLE (4) into VALVE BODY (5). Tighten SPOUT NIPPLE (4) to VALVE BODY (5).
• Thread ESCUTCHEON MOUNT (6) onto SPOUT NIPPLE (4) until it engages the O-RING (2).
Make sure GASKET (7) is in place. ESCUTCHEON MOUNT (6) Flush against nished wall.
Push SPOUT 8) with SPOUT O-RINGS (9) into ESCUTCHEON MOUNT (6)
until seated against stop.
Determine where the nished wall location will be. This measurement
is very important! Note: The rough-in measurement from the nished
wall is; 1-9/16" (40 mm) minimum and 2-7/16" (62 mm) maximum.
This is a 7/8" (22 mm) tolerance. See rough-in illustration.
Secure WALL BRACKET (1) to cross brace of wall structure
at required height using six wood screws.
Mount VALVE BODY (1) to WALL BRACKET (2) as shown. Level and tighten
SET SCREWS (3) to secure VALVE BODY (1) to WALL BRACKET (2).
Connect HOT water supply to LEFT INLET UNION (4) and COLD water supply
to RIGHT INLET UNION (5). Pipe connections are 1/2” NPT. Use sealant or
Teon tape on pipe connections. Do not solder directly to valve body.
With valves closed open supply lines and check for leaks. Remove
PLASTER GUARDS (6) and open both valves and check for leaks.
Close both valves and turn off water supplies. Replace
PLASTER GUARDS (6) and nish wall construction.
INSTALL WALL BRACKET
INSTALL VALVE BODY
WOOD SCREWS
CROSS BRACE
WALL STUDS
1
16"
(406 mm)
HOT
COLD
6
6
5
4
3
2
1
2
2
4
4
8
6
9
O-RING
7
GASKET
1 1
5
3
Figure A