Installation Sheet
- 2 -
M965703 1.0 (5/17)
1 2
3
HOSE ASSEMBLY
• If HANDLES (1 & 2) and HANDLE BASE (3) are installed on
VALVE BODIES (4) they must be removed to install VALVE BODIES (4)
from under lavatory or mounting surface.
• To remove CROSS HANDLE (1); Pull-out INDEX CAP (5) and
remove HANDLE SCREW (6). Pull off CROSS HANDLE (1) and
unthread HANDLE BASE (3).
• To remove LEVER HANDLES (2); loosen SET SCREW (7) with
Hex Wrench provided with faucet. Pull LEVER HANDLE (2) off and
unthread HANDLE BASE (3).
• Thread LOCKNUT (8) to bottom of VALVE BODY (4). Make sure FIBER
WASHER (9) and RUBBER WASHER (10) are installed. Insert VALVE BODY (4)
through mounting hole from underside of SINK or mounting surface.
Note: Maximum mounting thickness is 1-1/4" (32 mm)
• Thread LOCKNUT (8) to bottom of VALVE BODY (4). Make sure
FIBER WASHER (9) and RUBBER WASHER (10) are installed.
Insert VALVE BODY (4) through mounting hole from underside of
SINK or mounting surface.
• Thread HANDLE BASE (3) until snug against internal stop. Set VALVE
BODIES (4) so that their outlets are facing toward SPOUT TEE (11) and
then tighten LOCKNUT (8) using wrench.
• Tighten COUPLING NUT (12) on SUPPLY HOSE (14) to OUTLET (13) making water tight connection.
Important: Loop SUPPLY HOSES (14) as shown so they do not kink.
INSTALL HANDLES
• FOR LEVER HANDLES: Install FRICTION WASHER (15) onto base of LEVER HANDLE (2). With VALVE in off position
align LEVER HANDLE (2) as shown. Install LEVER HANDLE (2) onto VALVE STEM (16) and tighten SET SCREW (7) with
HEX WRENCH supplied.
• FOR CROSS HANDLES: With VALVE in off position align CROSS HANDLE (1) as shown. Install CROSS HANDLE (1) onto
VALVE STEM (16) and tighten HANDLE SCREW (6). Insert HOT INDEX (5) into left CROSS HANDLE and COLD INDEX (17)
into right CROSS HANDLE.
• Insert SPOUT SHANK (1) through
center hole of sink or mounting
surface. Make sure RUBBER
WASHER (2) is seated into groove
in SPOUT ESCUTCHEON BASE (3).
• Assemble RUBBER WASHER (4),
BRASS WASHER (5) and
LOCKNUT (6) onto threads of SPOUT
SHANK (1) from underside of lavatory
or mounting surface.
• Align SPOUT (7) and tighten
LOCKNUT (6). Insert LIFT ROD (8)
through SPOUT (7).
SPOUT ASSEMBLY TEE ASSEMBLY
CAUTION
Turn off hot and cold water
supplies before beginning.
• Thread TEE BODY (1) COUPLING NUT (2)
to SPOUT SHANK (3).
1
2
3
7
8
GROOVE
4
6
5
1
3
2
5
6
1
3
2
8
4
1213
14
9
11
10
7
HEX WENCH,
SUPPLIED
15
COLD
HOT
1-1/4'' MAX.