Installation Sheet

- 2 -
M965701 Rev. 1.1 (5/17)
1
2
INSTALL VALVE BODY
Mount VALVE BODY (1) to WALL BRACKET (2) as shown. Level and tighten SET SCREWS (3) to secure
VALVE BODY (1) to WALL BRACKET (2).
Connect HOT water supply to LEFT INLET UNION (4) and COLD water supply to RIGHT INLET UNION (5).
Pipe connections are 1/2" NPT. Use sealant or Teon tape on pipe connections. Do not solder directly to valve body.
With valves closed open supply lines and check for leaks. Remove PLASTER GUARDS (6) and open both
valves and check for leaks.
• Close both valves and turn off water supplies. Replace PLASTER GUARDS (6) and nish wall construction.
Determine where the nished wall location will be. This measurement is very important! Note: The rough-in measurement
from the nished wall is; 1-9/16" (40 mm) minimum and 2-7/16" (62 mm) maximum. This is a 7/8" (22 mm) tolerance.
See rough-in illustration above.
• Secure WALL BRACKET (1) to cross brace of wall structure at required height using six wood screws.
INSTALL WALL BRACKET
WOOD SCREWS
CROSS BRACE
WALL STUDS
1
16" (406 mm)
HOT
COLD
6
6
5
4
2
1
3