Installation Sheet

- 1 -
INSTALLATION INSTRUCTIONS
SAVE FOR FUTURE USE
Product names listed herein are trademarks of AS America, Inc.
© AS America, Inc. 2017
7302264-100 (8/17)
RECOMMENDED TOOLS AND MATERIALS
Most of the procedures require the use of common tools and materials, which are available from hardware and plumbing,
supply stores. It is essential that the tools and materials be on hand before work is begun.
REPLACEMENT USE
When replacing an original unit be sure to shut off water supply before removing the unit or disconnecting water supply lines
and drain ttings. Original supply lines and shutoff valves should be replaced and used with ttings and adapters to match
the hookups on the replacement unit.
!
USE TEFLON SEALANT TAPE ON PIPE THREADS FOR WATERTIGHT CONNECTIONS!
Thank you for selecting DXV. To ensure this product is installed properly, please read these instructions carefully before you begin.
(Certain installations may require professional help.) Also be sure your installation conforms to local codes.
CAUTION: PRODUCT IS FRAGILE. TO AVOID BREAKAGE AND POSSIBLE INJURY HANDLE WITH CARE!
NOTE: Pictures may not exactly define contour of china and components.
!
Models: D20161008 - 24"
D20160008 - 30"
Oak Hill
Lavatory with Deck
Adjustable Wrench
Regular Screwdriver
Phillips Screwdriver
10'
Electric
Drill Saber Saw
Plumbers' Putty or
Caulking
Tape Measure
Level
Channel LocksPipe Wrench
Hacksaw
Tubing Cutter
Square
FINISHED
FLOOR
26-15/16"
(684 mm)
5-1/16"
(128 mm)
6-15/16"
(176 mm)
30"
(761 mm)
FINISHED
FLOOR
FINISHED
WALL
20-1/2"
(520 mm)
28-1/4" (718 mm)
35" (889 mm)
30" (761 mm)
30-5/8" (778 mm)
33-5/8" (854 mm)
22"
(559 mm)
23-9/16"
(599 mm)
13"
(330 mm)
18"
(458 mm)
ROUGHING-IN DIMENSIONS:
• For reference
OAK HILL 30" CONSOLE D21411030 WITH 30" OAK HILL LAVATORY D20160008
IMPORTANT:
THE OAK HILL LAVATORY (MODEL D20160008)
CANNOT BE INSTALLED AS A WALL HUNG
LAVATORY. THE LAVATORY MUST BE
INSTALLED USING THE OAK HILL CONSOLE
STAND, VANITY OR COUNTERTOP.

Summary of content (3 pages)