Installation Sheet

- 2 -
7302038-100 Rev. F (6/17)
In the United States:
DXV
One Centennial Avenue
Piscataway, New Jersey 08855
Attention: Director of Customer Care
For residents of the United States, warranty
information may also be obtained by calling
the following toll free number: (800) 227-2734
www.DXV.com
In Canada:
DXV
5900 Avebury Road
Mississauga, Ontario
L5R 3M3
Canada
Toll Free: 1-800-387-0369
Local: 905-306-1093
Fax: 1-800-395-1498
www.DXV.ca
In Mexico:
DXV
Via Morelos 330
Col. Santa Clara Coatitla
Ecatepec, Estado de México 55540
Toll Free: 01-800-8391200
www.DXV.mx
VANITY INSTALLATION
PART
INSTALLING BASIN
Typical installation includes installation of faucet, connection of exible water supply lines, attachment of basin to countertop,
sizing and installation of drain to house water system.
7381350-200.XXX0A — Ceramic Drain Cover
STEP 1. Using carpenters square ensure that the countertop is level. Next, carefully position the lavatory in the desired
location for the basin. Ensure you have provided proper clearance under the countertop for the faucet, supply lines,
drain assembly and the structural parts of the cabinet. Mark desired drain and faucet location on countertop with
pencil. Please refer to faucet installation instructions to verify desired faucet rough-in areas.
STEP 2. Drill a 4" (102 mm) hole at drain location. Drill a hole at faucet mount location using faucet installation instructions
for exact positioning.
STEP 3. Position lavatory in place, centering it above the drain hole. Place clear silicone bead around perimeter of lav where
lav meets counter.
STEP 4. Pre-assemble P-trap drain connections in accordance with manufacturer’s instructions. Check that pop-up drain
opens and closes properly when drain control is operated.
STEP 5. Connect supply lines to shutoff valves and securely tighten nuts.
STEP 1. Install faucet and drain in accordance with manufacturer’s instructions. Hand tighten drain and add one quarter turn
to allow the sink to expand and contract with changing water and room temperatures. If drain leaks, add another
quarter turn. Repeat this process until leak stops. Do not over tighten to prevent stress cracks. Turn on water supply
valves and water-test installation.
STEP 1. Place Ceramic drain cover on top of metal pop-up drain; ensure DXV logo is facing to the front.