Manual
Analog Panel Meter  Instruction Manual 
18 
Configuration for 12 or 24 VDC Power Option 
Warning! 
Do not exceed voltage rating of the selected  
configuration. 
Meters equipped with the 12/24 VDC power option are shipped from 
the factory ready to operate from 24 VDC. 
To configure the meter for 12 VDC power: 
1.  Remove all the connectors. 
2.  Unscrew the back cover. 
3.  Slide the back cover about 1 inch. 
4.  Configure the J9 jumper, located behind the power connector, for 12 
V as shown below. 
Figure 4: Jumper Configuration for 12/24 VDC Power
MAIN BOARD
24 VDC
12 VDC
POWER
J9
12 V
24 V
J9 CONFIGURATION
Factory
Default
M-LINK
+
_










