Operation Manual

www.dwt-zelte.com
Junior Air
Tips:
Use all groundfixing options to
complete the set up propperly. Invest
some extra time to do this and use
all fixing options and guy lines.
Check the groundfixing and guy lines
regularly. While temperature and
humidity changes fabric might extend
or shrink. That might have an effect
to the groundfixing. It becomes loose
or cause damages!
Check pressure in airtubes! Also
air volume in tubes are effected
by changing weather conditions.
Low temperatures let pressure
decrease, tent will be instable. High
temperatures cause higher pressure.
Tubes could burst! Make sure that
air pressure is adjusted to weather
conditions at anytime
Dismantling
1. remove roof poles.
2. release all fixing points, groundfixing guy lines. Except the
4 corners!
3. Release air pressure from tubes while unscrewing the valve.
4. remove groundfixing at the corners.
Before final packing tubes must be completely flat. Valve shall be
screwed in with just a few turns. Make sure flysheet is completely
dry.
Find the video clip here:
http://www.dwt-zelte.de/ratgeber/aufbauanleitungen/
aufbauanleitung-junior-air/
Important advice for correct storage of all AIR IN models!
- Temperatures below 5°Ceslius harm air tubes. Please, assure
that storage room is above that temperature.
- Fabric shall not become humid while stored. Humidity causes
mold witch cannot be cleaned or washed away.
- Valves shall be screwed in with just a few turns. Do not fully
close it.
- Do not lay any heavy items onto the flysheet.