Specifications
Installer’s Guide – (Gas Post-Boost) Solar Water Heater
25
H4110 4110 Rev. F
•  Close the hot water outlet, then 
repeat the above sequence to 
conrm the setting.
•  Close the hot water outlet.
Setting the High Burner Rate
•  Set the Lower Dip Switch Block 
(2) for maximum output setting as 
shown right.
•  Open a hot water outlet fully in order 
to start combustion.
•  Slowly rotate the maximum gas 
control volume screw (4) clockwise or 
anti-clockwise until the correct high 
rate test point pressure is achieved.
•  Close the hot water outlet, then 
repeat the above sequence to 
conrm the setting.
•  Close the hot water outlet.
•   Return the Lower Dip Switch Block 
(2) to the OFF position as shown 
right.
•  Disconnect the manometer from the 
test point and replace the blanking 
screw.
•  Replace the front cover.
Installer’s Guide
Tick Task See Step No.
Installer’s Guide read 1
Safety audit conducted 2
Existing tank removed 3
Tank positioned on a level fireproof base in accordance with all 
plumbing and building regulations
4
Cold and hot water pipes connected 5 – 6
Collectors aligned and attached to roof 7 – 11
Fittings attached to collectors 12 – 16
4 Way Union Assembly fitted 17
Anti Frost Valve fitted 18
Roof penetration sealed with a flexible waterproof flashing 19
Temperature sensor installed 20 – 21
Heat Trap/Non Return Valve fitted 22
PTR valve fitted 23
Gas connected 24
GPO installed 25
Tempering valve fitted 26
Testing the gas 27
Adjusting Burner Test Point Pressure 28
Setting the Low Burner Rate 29
Setting the High Burner Rate 30
Commissioning Checklist 










