Specifications
Installer’s Guide – (Gas Post-Boost) Solar Water Heater
23
H4110 4110 Rev. F
Adjustments – 
Burner Test Point Pressure
•  The high and low test point 
pressures can be adjusted by doing 
the following: 
–  Unscrew the four front cover 
retaining screws and remove the 
front cover.
–  Unscrew the blanking screw from 
the manometer test point (label 1) 
and connect the manometer to 
the test point.
Setting the Low Burner Rate
•  Set the Lower Dip Switch Block 
(label 2) for minimum output setting 
as shown below.
•  Open a hot water outlet fully in order 
to start combustion
•  Slowly rotate the minimum gas control 
volume screw (label 3) clockwise or 
anti-clockwise until the correct low 
rate test point pressure is achieved.
Upper
Dip Switch
Lower
Dip Switch (2)
Minimum gas control 
volume screw (3)
Maximum gas control 
volume screw (4)
Manometer 
test point (1)
Installer’s Guide
Upper
Dip Switch
Lower
Dip Switch (2)
Minimum gas control 
volume screw (3)
Maximum gas control 
volume screw (4)
Manometer 
test point (1)










