2.0 COMMISSIONING THE SYSTEM
When both the plumbing and electrical connections have been completed the
system is ready to run.
Before applying power to the system ensure that the system is full of water
and pressurised.
Turn on the power supply; the Hotlogic control system will then check the
unit’s operating parameters. If conditions are suitable and there is enough
energy available in the surrounding air, the fan and compressor will turn on.
The Airoheat is self regulating so there are no internal adjustments to be
made during commissioning.
Airoheat has a 30 second delay built in after the power is switched on. Before
compressor and fan come on.
The Airoheat will continue to run until the storage tank is fully heated. With a
completely cold tank the first run of the system may take several hours to fully
heat the complete tank up to around 59°C, depending on the ambient air
conditions and the amount of available energy. Following its first conditioning
run the heat pump will heat up to around 63°C to replace the energy used
from the system.
If for any reason the Airoheat does not start, the water is cold and the Hotlogic
unit is not displaying any LED lights, an electrician should test that power is
available to the heat pump.
NOTE: There are no installer serviceable parts within the heat pump module.