Update Description

浙江东胜物联技术有限公司
Zhejiang Dusun Electron Co., Ltd.
杭州市大关路 189 号万通中 A 8 Floor 8, Building A, Wantong Center
Tel: 86-571-86769027/8 8810480 Hangzhou, China
Website: www.dusuniot www.dusunremotes.com www.dusunlock.com
SMT placement equipment:
Reflow soldering machine
Automated optical inspection (AOI) equipment
Nozzle with a 6 mm to 8 mm diameter
Baking equipment:
Cabinet oven
Anti-static heat-resistant trays
Anti-static heat-resistant gloves
2. Storage conditions for a delivered module are as follows:
The moisture-proof bag is placed in an environment where the temperature is below 30 and
the relative humidity is lower than 70%.
The shelf life of a dry-packaged product is six months from the date when the product is
packaged and sealed.
The package contains a humidity indicator card (HIC).
3. Bake a module based on HIC status as follows when you unpack the module package:
If the 30%, 40%, and 50% circles are blue, bake the module for 2 consecutive hours.
If the 30% circle is pink, bake the module for 4 consecutive hours.
If the 30% and 40% circles are pink, bake the module for 6 consecutive hours.
If the 30%, 40%, and 50% circles are pink, bake the module for 12 consecutive hours.
4. Baking settings:
Baking temperature: 125±5
Alarm temperature: 130
SMT placement ready temperature after natural cooling: < 36
Number of drying times: 1
Rebaking condition: The module is not soldered within 12 hours after baking.
5. Do not use SMT to process modules that have been unpacked for over three months.
6. Electroless nickel immersion gold (ENIG) is used for the PCBs. If the solder pads are exposed to
the air for over three months, they will be oxidized severely and dry joints or solder skips may occur.
Dusun is not liable for such problems and consequences.
7. Before SMT placement, take electrostatic discharge (ESD) protective measures.
8. To reduce the reflow defect rate, draw 10% of the products for visual inspection and AOI before
first SMT placement to determine a proper oven temperature and component placement method.
Draw 5 to 10 modules every hour from subsequent batches for visual inspection and AOI.