Instructions / Assembly
DUROFLEX VALLEY
Assembly Instructions:
Step 1 – Ensure the valley boards are in position prior to installation of
Duroflex Valley (10 inches on each side).
Step 2 – Place Duroflex Valley into the valley down to the eaves, remove
the backing and start sticking into place. A roller can be used to ensure a
good fit and adhesion.
Step 3 – Staple Duroflex band to the valley boards to secure.