Operation Manual

Set-up
44
Operating Instructions 971 Version 00.0 - 03/2014
To connect the stacker to the sewing unit:
Installing the
stacker
1. Release the clamping lever (1).
2. Push the stacker onto the sewing unit and guide the fastening rail (3)
into the bracket.
3. Set the clamping lever (1).
Height of the
stacker
4. The stacker's support plate (2) should have a clearance of approx. 3 mm
to the underside of the material holder.
5. Loosen the screws (4) and adjust the height of the stacker.
6.8 Electrical connection of the sewing unit
6.8.1 Setting the motor circuit breaker
The motor circuit breaker (1) must be adjusted according to the mains
voltage.
Correct setting
3 x 220 V = 4.8 A
3 x 230 V = 4.8 A
3 x 240 V = 5.0 A
3 x 380 V = 2.5 A
3 x 400 V = 2.5 A
3 x 415 V = 2.7 A
The mains voltage and the nominal voltage indicated
on the type plate of the motor must be the same.
Only persons authorized to do so may perform work
on electrical equipment. The mains plug must
always be disconnected.
Please note the general safety instructions.
DANGER