Operation Manual
Operation
Operating Manual 967 version 00.0 - 11/2013 25
Fig. 9: Threading – part 2
9. Guide thread through thread guide (10).
10. Pass thread through eyelet of thread take-up lever (9).
11. Guide thread through thread guide (11).
12. Wrap thread counterclockwise around thread clamp (12).
13. Guide thread through thread guides (13) and (14).
14. Pull thread behind thread guides until it moves into the thread
clamp (12).
15. Guide thread into the thread guide of the needle bar (15).
16. Run the thread through the needle eye (16) from left to right.
(9) – Thread take-up lever
(10) – Thread guide
(11) – Thread guide
(12) – Thread clamp
(13) – Thread guide
(14) – Thread guide
(15) – Thread guide on needle bar
(16) – Needle eye
ླྀ
ཹ
ེ
ཻ
ོ
ཽ
ཾ
ཿ