Operating instructions
Setting up
50
Operating instructions 906 - Version 00.0 - 05/2014
Figure 30: Scope of delivery 2
Scope of delivery:
• CNC-controlled double lockstitch machine (2), equipped with:
• Automatic sewing foot and clamp ventilation
• Stroke position adjustment
• Thread cutter
• Needle thread monitoring
• Threading device
• Multiple thread tensioning
• Automatic stacker (3)
• Compressed air maintenance unit (7) with compressed air pistol (6)
• Height-adjustable frame (4)
• Thread reel holders (1)
• Tools and small parts in accessory pack
• Additional equipment (optional)
(6) - Compressed air pistol (7) - Compressed air maintenance unit
⑦
⑥