Operating instructions

3. Completing and Screwing on the Table
–
Screw on the reinforcement brace 2 between the
cutouts for the machine head and the motor belt.
–
Screw the cable channel 5 and the mounting for the
wiring tension relief to the underside of the table.
–
Screw on the main switch 6.
–
Screw on the sewing light transformer, if included.
–
Lay the electrical wiring.
–
Screw on the drawer 8 with its mounting.
–
Screw the table onto the frame with B8x35 wood
screws. The positioning of the table to the frame can
be seen in the reference mark on the underside of
the table. See the dimension sketch.
–
Press the bottom hinge parts 3 for the machine
hinges into the recesses in the table and screw fast.
–
For the forward rest of the machine head insert two
rest plugs into the table and slide on pressure
springs. The left plug 1 must be inserted into the
hole as per section C-C and the right plug into the
hole as per detail Y. The ends of the plugs protruding
on the bottom of the table are to be cut off.
Technical Feature!
Through the positioning of the left retainer plug 1 a
lifting of the left machine hinge by ca. 1mm results
and thus an uncoupling from the table.
–
Screw the oil baffle 7 under the table with wood
screws in such a way that there is a gap of 55 mm
between the right edge of the oil baffle and the right
edge of the table cutout. Align the oil baffle to the
front and rear edge of the table cutout in such a way
that the machine head does not hit when tilted over.
The knee lever should later not hit the oil baffle in
any of its possible settings.
5