Operation Manual

Operating Instructions 650-10 - 02.0 - 10/2015116
8.9.3 Establishing equipotential bonding
Important
Before putting the machine into operation, you must establish
equipotential bonding in all necessary places.
Establish equipotential bonding as follows:
1. Establish equipotential bonding as specified in the wiring
diagram
( 13 Appendix, p. 149).
8.9.4 Connecting the knee lever
Fig. 79: Connecting the knee lever
Connect the knee lever as follows:
1. Lay the cable (3) from the knee lever (1) to the controller and
connect it to the plug
(2).
(1) - Knee lever
(2) - Plug
(3) - Cable