Operation Manual

Table Of Contents
Operation
Operating Instructions 581 - 00.0 - 02/2015 33
5 Operation
5.1 Switching the machine on and off
Fig. 9: Switching the machine on and off
Switching on the power supply
Step
1. Turn the main switch (1) into position I.
The welcome screen appears on the display, whereby
YYYY-MM-DD stands for the current date:
(1) - Main switch