Operating instructions
Contents Page:
Part 2: Installation Instructions Class 540-100-1
1. Scope of delivery.............................................. 3
2. General and Transportation Safety
2.1 Ringbolt ................................................... 3
3. Equipment
3.1 Structure of equipment ........................................... 4
3.2 Available equipment ............................................ 5
4. Optional equipment
4.1 Positioningaids............................................... 7
5. Assembling the sew ing automat
5.1 Makingthetabletop ............................................ 8
5.2 Mounting the frame ............................................. 9
5.3 Completion and mounting of table top .................................. 10
5.4 Settingtheworkingheight......................................... 11
5.5 Setting up the machine head ....................................... 11
5.5.1 Lengthwise installation ........................................... 11
5.5.2 Widthwiseinstallation............................................ 11
5.5.3 Swivel device (optional) .......................................... 12
5.5.4 Needle cooler (optional) .......................................... 13
5.6 Mounting the control unit.......................................... 15
5.7 Mounting the waste container ....................................... 15
5.8 Mounting the maintenance unit and the set value initiator ..................... 15
5.9 Mounting the pedal and the traction rod ................................ 15
6. Electrical connection
6.1 Plug connections at the multiple pin strip (4-fold) ........................... 16
6.2 Plug connections at the multiple pin strip (15 fold) .......................... 17
6.3 Potential compensation .......................................... 17
6.4 Control connection to main switch .................................... 18
7. Pneumatic connection
7.1 Connecting the maintenance unit .................................... 19
7.2 Connecting the waste container ..................................... 19
8. Oil lubrication
8.1 Filling the oil reservoir ........................................... 20
9. Soft ware installation
9.1 Standard delivery .............................................. 21
9.2 Softwareinstallation ............................................ 21
9.2.1 General .................................................... 21
9.2.2 Loading the program ............................................ 22
9.2.3 Dongle-Update via Internet ........................................ 23
9.3 Language setting .............................................. 23
10. Sew ing test ................................................. 24
2