Operation Manual
Table Of Contents
- 271743-01-Deckblatt
- 271743-02-VoSi -D-
- 271743-03-Inhalt-D-1
- 271743-04-Inhalt-D-2
- 271743-05-VoSi -GB-
- 271743-06-Inhalt-GB-1
- 271743-07-Inhalt-GB-2
- 271743-08-VoSi -F-
- 271743-09-Inhalt-F-1
- 271743-10-Inhalt-F-2
- 271743-11-VoSi -E-
- 271743-12-Inhalt-E-1
- 271743-13-Inhalt-E-2
- 271743-14-VoSi -P-
- 271743-15-Inhalt-P-1
- 271743-16-Inhalt-P-2
- 271743-17-VoSi -I-
- 271743-18-Inhalt-I-1
- 271743-19-Inhalt-I-2
- 271743-Standbogen

9. Pneumatic Connection
ATTENTION !
The fault-free functioning of the pneumatic units is only
assured when the line pressure is 8 to 10 bar.
The operating pressure of the special sewing machine is
6 bar
.
Pneumatics connection pack
A pneumatics connection pack for stands with a compressed air maintenance unit is
available under the order no. 0797 003031.
It contains the following components: - Connection hose, 5 m long Ø = 9 mm
- Hose nozzles and hose clamps
- Coupling socket and coupling plug
- Maintenance unit with pressure gauge
and pressure regulator
Connecting the compressed air
maintenance unit
–
Fasten the compressed air maintenance unit 1 to the stand brace with the angle,
screws and bracket.
–
Connect the compressed air maintenance unit to the compressed air line with
connection hose 4 ( Ø = 9 mm) and hose coupling R1/4".
Setting the operating pressure
The operating pressure is
6 bar
.
It can be read at the pressure gauge 3.
–
To set the operating pressure, pull up knob 2 and turn.
Increase pressure = Turn knob 2 clockwise
Decrease pressure = Turn knob 2 counterclockwise
2
3
1
4
GB
73