Operation Manual

3.6 M oun ting the tra y
The trays 2 and 3 have been rem oved for transportation.
Loosen screw s 4 and 5.
Push the spars 1 right to the top.
Retighten screw s 4 and 5.
Put the trays 2 and 3 on the spars 1 and draw them to the
corresponding working height.
Tighten screw s 6.
10
3 2 1 5 1 4
2 6 3