Operation Manual

6
3.3 M oun ting the thre ad reel hol der
Insert the thread reel holder 1 in re tainer 2.
Tighten the thread reel holder 1 with the screw 3.
3.4 M oun ting the con tro l pa nel
The contro l panel 2 has been rem oved for transportation and the
tube 3 has been low ered.
Loosen screw s 4.
Pull the tube 3 right to the top.
Retighten screw s 4.
Screw the contro l panel 1 on the tube.
Push plug 2 into the contro l panel and secure with the two screw s.
2 1 3 1
4 3 2 1