Operation Manual
2
1. Sco pe of de li very
The scope of delivery is dependent on your order.
The sew ing unit consists of:
–
1Sewing machine head (a s per order)
–
2 Thread reel holder
–
3 C ontro l with contro l panel
–
4Material tra y
–
5clam p for knee lining (optional)
–
6Fusing station for knee lining (optional)
–
7 Foot sw itch
–
8Stand and table top
–
9Suction device with suction container
–
10 Stacker (a s per order)
–
11 E jector
–
C om pressed air maintenance unit with com pressed air
pistol
2. G e ne ra l
ATTENTION !
The sew ing unit must only be installed by tra ined specialist staff.
Any work on the electrical equipm ent of the sew ing unit must
only be c a rried out by electricians or correspondingly instru c ted
persons.
The mains plug must be pulled out.
The enclosed operating instru c tions of the drive motor m anufacturer
have to be observed.
3