Operation Manual
5.7 Feeding the trousers partsandstarting the sew ing operation in conjunction w ith
the fusing station
The overlock unit1265/5 w orks sem i-autom atically.
The operatorofthe sew ing unithas to proceed as follow s:
l
callup the seam program “Lining below ,sew ing startatthe
waistband”
l fuse upperfabric and knee lining atthe fusing station
l feed the w orkpiece accurately
l supervise the sew ing process
l re m o v e the finished partsfro m the stacker
l change the program and callup the seam program “Lining below ,
sew ing startatthe hem ”
l feed the w orkpiece accurately
l supervise the sew ing process
l re m o v e the finished partsfro m the stacker
Feeding the trousers partand starting the sew ing process
1) S electthe seam program atthe controlpanel(see chapter6.4.2).
2) P lace the trousers part1 fro m the righton the tabletop 2 and
stra ightunderthe contourguide 3.
ATTENTION!
As soon as the trousers partis pushed underthe lightbarrier4,the
sew ing process starts autom atically and the contourguide3low ers.
1
21
43 1 21