Operation Manual
Set-up
Operating manual 100-69 version 00.0 - 05/2013
73
Fig. 59: Checking the oil level
Checking the oil level for the lubrication of the machine head
The oil level in the oil reservoir (2) must not drop below the marking “Min”.
If necessary, fill oil through the drill-hole (1) up to the upper marking "Max".
6.8 Putting into operation
After completion of the installation work a sewing test should be made.
1. Plug in the mains plug.
2. Threading the needle thread, chapter 5.5.
3. Thread in the looper thread.
4. Turn the main switch on.
The control is initialized.
5. Step back on the left pedal.
The reference run starts.
The transport carriage stops in its rear end position.
The reference position is necessary in order to get a defined initial
position of the transport carriage.
(1) - Drill-hole (2) - Oil reservoir
ཱ
Risk of injury due to pointed items and glare
Turn off the main switch before threading in the
needle and hook thread.
Do not look into the light source.
DANGER