Operation Manual

Operation
Operating manual 100-69 version 00.0 - 05/2013
51
Removing the stacked workpieces
1. Actuate the foot switch (6) and hold it down.
The stacked goods stand (4) is lowered.
2. Remove the stacked workpieces.
5.11.5 Roll-off device
The stacker extension is used in conjunction with the throw-over stacker.
The transport rollers (1) convey the workpiece into the stacker opening.
This is necessary for all workpieces positioned in transverse direction or
for those which are too short for being seized by the throw-over stacker
(e.g. when sewing linings of inside pockets).
The workpiece must have a minimum length of 200 mm from the middle
of the pocket opening to the left edge so that it can be safely seized by the
transport rollers (1).
The transport rollers (1) are driven via an electronically adjustable drive.
The roller speed and the on-time can be separately set to several grades
at the control panel of the control unit.
Activating and switching on the stacker extension
Activate the roll-off device at the control panel in the menu item
“Seam parameters”, Programming Instructions. The parameter
indicates to the control unit that the sewing unit is equipped with a
roll-off device.
Switch on the throw-over stacker and the stacker extension in the
menu "Seam parameters", Programming Instructions.
Material damage!
During the rolling-off the solenoid valves have a dual function.
Stacker switched on: Roll-off device serves as stacker extension
Stacker switched off: Roll-off device serves as ejector
ATTENTION