Operation Manual

Operation
Operating manual 100-69 version 00.0 - 05/2013
50
Fig. 38: Throw-over stacker swung-out
Function sequence
During the sewing cycle the material runs into the opening between
the stacked goods stand (4) and the clamping pipe (3).
After the incision of the corners and the lifting of the feed clamps, the
stacking process is triggered by a control pulse. The clamping
pipe (3) and the smoother (1) swivel against the stacked goods
stand (4).
The work piece is clamped.
A pneumatic cylinder retains the clamping pipe (3) at the stacked
goods stand (4).
The clamping pipe (2) opens.
For this it swivels away from the stacked goods stand (4).
The smoother (1) lifts and smoothes out the workpiece above
stacked goods stand (4) and holder (5) and then moves to its initial
position.
The clamping pipe (2) closes.
For this it swivels back against the stacked goods stand (4) and
clamps the stacked workpiece.
The clamping pipe (3) and the smoother (1) swivel back together to
their basic position. The clamping pipe (2) is thereby retained at the
stacked goods stand (4).
(1) - Smoother
(2) - Clamping pipe
(3) - Clamping pipe
(4) - Stacked goods stand
(5) - Holder
(6) - Foot pedal