Installation & Assembly

7 Nm
5 ft-lbs.
70
8 Nm
19 mm
NOTICE
Leakage through wrong
installed hoses
> Make sure that hoses are not kinked or
twisted during installation.
> Hand-tighten the securing nut onto the
underside of the spout body.
> Tighten the screws maximum torque
5ft-lbs.
CAUTION
The hot valves can cause
scalding
> Avoid contact.
> Attach supply lines to each valve body and
attach supply lines to shutoff valves.
> Connect cold water valve with the handle
with blue dot and hot water valve with the
handle with red dot.
CAUTION
Cut and crush injuries
> Wear gloves during installation.
> Use two wrenches, as shown, to connect the
hoses to the stops.
MAL_57157/17.06.1 7
en
X X
XX7
109
8