Installation

6
and ceilings, always install a Ceiling Support
Firestop Spacer.
F. When the PelletVent enters the Attic, install
an Attic Insulation Shield around the vent
(Figures1 & 3). This will prevent insulation and
debris from collecting near the vent pipe. Use
(4) wood screws to secure the base of the Attic
Insulation Shield to the framed opening. Adjust
the height of the Attic Insulation Shield by
sliding the top cylindrical shield over the one
from the base. Insure that the top of the Shield
is above the level of building insulation. Secure
the Shield in place with at least two (2) sheet
metal screws through the side of the cylindrical
shield. Attach collar around the top of the Attic
Insulaiton shield.
G. After lining up for the hole in roof,
using the same method as 2.(B), cut either
a round or square hole in the roof. Always cut
the hole with the proper clearance to
sides of Flashing under the roong materials
and nail to the roof along the upper edge. Do
not nail across the lower edge. Seal all nail
heads with non-hardening waterproof sealant.
H. To nish, apply high-temperature
waterproof sealant where the Storm Collar
will meet the vent and Flashing; slide Storm
Collar down until it sets on the Flashing, put
the Cap on and twist to lock (Figure 2).
If the ue exits on back of stove and an
interior installation is desired (Figure 3):
A. Place the appliance according to the
manufacturer’s instructions.
B. Connect a Pipe Adapter to the back of the
stove and attach a Tee to Pipe Adapter, align,

 
3” Ceiling Support/
Firestop Spacer
9-3/4” x 9-3/4”
4” Ceiling Support/
Firestop Spacer

10-3/4” x 10-3/4”
3” & 4” Cathedral
Ceiling Support Box
10-3/4” x 10-3/4”
3” & 4” Wall Thimble
7-1/2” x 7-1/2”

VERTICAL CAP
STORM COLLAR
FLASHING
ATTIC
INSULATION
PIPE ADAPTER
CEILING SUPPORT
FIRESTOP SPACER
SEE TABLE 1
FOR FRAMING
REQUIREMENTS
1 INCH MINIMUM
ATTIC
INSULATION SHIELD
PELLET
VENT PIPE
STOVE