Instructions / Assembly

24
5-INCH OVAL GAS VENT FOR
INSTALLATION IN 2” X 4” STUD
WALLS
MH6375 CATEGORY I APPLIANCES ONLY
Where pipe passes through the roof, maintain
1-inch minimum clearance to all combustible
materials.
Install oval ashing, storm collar, and oval vent
cap.
Gas vent shall extend at least 2 feet above the
highest point where it passes through the roof,
and at least 2-feet higher than any portion of
the building within 8 feet.
Attach base plate to 2” x 4” support. Firestop
spacers shall be installed as shown on all
oors.
1. Saw out portion of header between studs
and install one restop spacer.
2. Nail the second restop spacer in position,
after oval pipe is in place.
3. Additional oors above are installed in the
same manner.
Use only vents labeled “For Exterior Use
Only”, above rooine. (Canada Only)
OVAL PIPE
FIRESTOP
SPACER
FIRESTOP
SPACER
BASE PLATE
AND TEE
SUPPORT
1 INCH MINIMUM
CLEARANCE TO
COMBUSTIBLES
CAP
STORM COLLAR
ROOF FLASHING
OVAL
TEE
OVAL
PIPE
2” X 4” SUPPORT