Installation

6
Oil burning equipment, CSA B139.












  are tested and
listed as alternative lining materials to standard
clay tiles and can be installed into existing
clay tiles, or clay tiles may be removed and
replaced with a .


 

. Leave enough clearance for the liner
to slide into place without difculty. If round
 do not t a chimney’s
inside dimensions, they may be ovalized to
allow proper t. When ovalizing a
, its cross sectional area decreases.
Refer to L1244 for details or contact your
 supplier for assistance.
When ovalizing DuraFlex SW
®
, Please
refer to Installation Instruction #L1244.
Instructions available online at www.duravent.com
 While insulation is not required
for every installation (refer to UL1777
or ULC-S635 for appropriate listings or
standards), the performance of the entire
heating system is greatly enhanced when
installing insulating materials. The venting
system acts and reacts in step with the
heating unit’s operation. Insulation improves
draft and minimizes condensation, helping
ue surfaces warm up more quickly to
achieve a heater’s rated efciency. Insulation
is particularly important for exterior chimneys.
Read the sections outlining insulating
procedures before beginning the installation.

















The following tools and supplies may be
required when installing 
:
Hammer
Key Hole Saw(s)
Screwdriver w/Hex head
Reversible Electric Drill
Cold Chisel
Mortar Mixing Trough
Tin Snips
Silicone Caulk
Trowel
Refractory Mortar
Measuring Tape
Ladder