Submittal

19
Figure 13
BRACKET
POLYPRO PIPE
W/PVC ADAPTER
SUPPLIED WITH
TERMINATION KIT
Figure 12
SCREW TO
TERMINATION
AIR INTAKE
EXHAUST
COLINEAR
ADAPTER
INSTALL
GASKETS
EXTERIOR
WALL PLATE
INTERIOR
WALL PLATE
HORIZONTAL
TERMINATION
Horizontal Twin Pipe (Fig.11)
1. Locate penetration.
2. Cut or cut and frame hole. (Table 3)
3. Attach interior wall plate to inside wall.
4. Attach and seal exterior wall plate to outside wall.
5. Slide pipes through outer plate.
6. Rotate pipes to slide pipe past keyway.
7. Slide exhaust tip into exhaust pipe.
8. Mount outer cover plate to exterior wall plate.
9. install Poly Pro venting system to/from termination to
appliance.
Horizontal Concentric (Fig.12)
1. Locate penetration.
2. Cut hole. (Table 3)
3. Attach and seal exterior exterior wall plate onto outside
wall.
4. Slide cap through exterior wall plate into hole from
outside building. Cap must not be installed sloped
downward.
5. Orient termination so air intake slots face down.
6. Seal termination to exterior wall plate with silicone
sealant.
7. Slide interior wall plate over termination and attach to
wall from inside the room.
8. Attach interior wall plate to termination with provided
hardware.
9. Install gaskets into Co-Linear Adapter.
10. Attach Co-Linear Adapter to Horizontal Termination.
11. Install Poly Pro venting system to/from termination to
appliance.
Lochinvar / IPEX twin plate termination connector- 2"
installation (Fig.13)