Installation Guide
12 mm
2. mm
1311 mm
1311 mm
1 mm
1 mm
2. mm
1311 mm
1311 mm
1
2
3
ote t is iortant that these instrutions
are olloed ste b ste.
Parts Needed:
Note
A. Fondation Colmn Stands & ase Cannel
Fig.1
Fig.3
Fig.2
Step - 1
321mm
L
C
L
C
mm
mm
mm
mm
1mm
23 mm
mm
23 mm
mm
1mm
Anor olt Holes for Colmn Spport
Conrete Platform
Te sed mst be onstrted on a solid base
fondation. A concrete ad or a lare sie concrete
atio stone sares is recommended for sitable floor
base. Mae sre it is firm and level and ill allo
drainae aay from te site. e base fondation
sold be at least 4 inces100mmlarer tan te sed
dimensions. Please refer to te front ae of yor
oners manal for te eterior dimensions of te sed.
Manfatrer is not responsible for te oie and
onstrtion of te fondation
or a onrete ad base reare a leel
bed or a ir ooting laer o rushed
stone. he onrete ad should then be
oured to a thiness o inhes
to 5 inhes 5. llo to
dr thoroughl or at least hours
IMPORTANT: USE HAND GLOVES TO PREVENT INJURY.
Code Qty.
C01 4
C02 2
C03 1
C04 1
C05 2
CP01 4
CP02 4
CP03 2
S1 2
S 27
S14 32
1 27
Use 12mm12 Inc Concrete drill bit.
TIP
1 12 In
1 In
1 In
1 In
1 In
2 3 In
2 3 In
11 In
11 In
21 1 In
3. In
2 3 In
1 3 In
2 3 In
2 3 In
3.1 In
2 3 In
1 3 In
2 3 In
3. In
Front Side
a Side