Installation Guide

A. Foundation
Note: It is important that these instructions
are followed step by step.
1
1. Assemble the channel (F01H) & (F02H) together
using 4 (S1) screws. Make 2 sets.
F01H
S1
F02H
Parts Needed:
(2) Foundation ‘U’ Channel (F01H)
(2) Foundation ‘U’ Channel (F02H)
(4) Foundation ‘L’ Angle (F03)
(6) Foundation ‘U’ Channel (F04A)
(6) Foundation ‘U’ Channel (F05A)
(21) Foundation ‘U’ Channel (F06A)
(18) Foundation ‘U’ Channel (F07)
(4) Foundation ‘U’ Channel (F03H)
(8) Foundation ‘U’ Channel Joint (F08)
(1) Base ‘U’ Channel (B1LH)
(1) Base ‘U’ Channel (B1RH)
(1) Base ‘U’ Channel (B1LA)
(1) Base ‘U’ Channel (B1RA)
(1) Base ‘U’ Channel (B21)
(1) Base ‘U’ Channel (B22)
(1) Base ‘U’ Channel (B3LA)
(1) Base ‘U’ Channel (B3RA)
(3) Base ‘U’ Channel (EXTL)
(3) Base ‘U’ Channel (EXTR)
Screws (S1)
1. All parts are clearly marked and care
should be taken to use the correct one.
Note
Over lapping
Parts Needed For Each Extension:
(3) Foundation ‘U’ Channel (F06A)
(6) Foundation ‘U’ Channel (F07)
(2) Foundation ‘U’ Channel (F03H)
(4) Foundation ‘U’ Channel Joint (F08)
(1) Base ‘U’ Channel (EXTL)
(1) Base ‘U’ Channel (EXTR)
Screws (S1)
PART 1 : Assembling Shed With Extension Kit
2. Set the Torque limit of your Screw drill to
#3 or #4 to ensure the screws do not
strip the metal reinforcements.