Use and Care Manual
2
4. Slide front column right (FCRE) into groove of the the
front fase pallet (BPF) on the right side of the pallet. Line
up the pre-drilled holes on (FCRE) column with pre-drilled
holes on front base pallet. Secure with four (S5) screws
with (S6) washers from outside.
(See blowup detail fig.1)
BPF
FCRE
BPB
fig.1
S5
FCRE
S6
BPF
5. Assemble the center bands (CB2E) & (CB3SB) with (S3) screws
with nuts. Follow overlapping method shown below. Make two set.
For Center Band, Roof structure (RS3E) & (RS3SB).
Overlapping Method
Step 2
Step 3
Step 5
Step 4
5a. Add one (CB3SB) for each extension.
CB3SB
CB2E
CB3SB
CB2E
Step 1
Use a hammer to
align the holes.
TIP