Use and Care Manual
Inside Back of the Shed
CME
15
10. Place the (RS1E) roof structure into position on top of back middle columns (CME). Line up pre-drilled holes
with column fittings (FMC). Use (S1) screws to fix (RS1E) roof structure to (FMC).
RS1E
Note
Make sure (RS1E) roof structure’s
U-Channel is positioned down.
FMC
Back Inside
RS1E
Back Inside
FMC
RS1E
Step 2
Step 1
Small diameter holes side facing inside
of the shed.
Big diameter holes side facing outside
of the shed.
RS1E
RS1E
CME
CME