Use and Care Manual
8
SPE
CCE
BPB
BPF
SPE
CME
BPB
BPF
SPE
S5
S6
CME
CME
SPE
BPF
BPB
SPE
FCLE
FCLE
S5
S6
BPF
18. Insert the side panel (SPE ) into the groove of
column (CCE). Start at the bottom with panel at an
angle then push into place.
19. Slide the middle column (CME) into base pallet groove.
Use (S5) screws with (S6) washer to secure column to the base
pallet. See blowup.
20. Insert the side panel (SPE ) into the groove of
middle column (CME). Start at the bottom of the panel
at an angle then push into place.
21. Slide the front column (FCLE) into the groove of
the front base pallet (BPF). Line up the pre-drilled holes
on (FCLE) column with pre-drilled holes on base pallet.
Fix with (S5) screws with (S6) washers from outside.
See blowup detail.