Instructions / Assembly
9
Parts Needed:
(2) RS1 Roof Structure (RS1E)
(4) RS2 Roof Structure (RS2E)
(2) RS3 Roof Structure (RS3E)
(2) RS5 Roof Structure (RS5E)
(1) Door Stopper Horizantal (DSHE)
(1) Door Column Fitting Left (FDCL)
(1) Door Column Fitting Right (FDCR)
(4) Corner Column Fitting (FCC)
(1) Middle Column Fitting (FMC)
(4) 90 Degree Joint (RJ)
Fig2: Use (S1) screws.
Fix (CB3SB) to (FCB)
and (CB2B).
FCB
CB2B
CCE
CB3SB
Fig.1: Use (S2)
screw. Fix (FCB)
to (FCLE). Leave it
loose.
FCLE
FCB
Note
After completing the center band assembly fully tighten
the four center band fittings (FCB) to the columns.
CME
2
CB2B
SPE
SPE
CB2E
SPE
2
BPB
CB2E
SPE
1&
4
BPF
FCLE
CB2B
3
FCLE
CME
CB2E
CCA
Inside
CB2B
22. To stabilize the side panel attach the center band (CB2E)
and (CB3SB) assembly. Start with the center band fitting (FCB).
Fix to corner column (CCE) & (FCRE) with (S2) screws. See
figures (fig.1 to 4).
Fig.4: Use (S1)
screw. Fix (CB2E)
to (FCB).
FCLE
CB2E
FCB
CB3SB
Fig.3: Fix to (CME)
with (S1) screw.
CME
CB2E
CB3SB
Door Opening
53 1/2”
1357mm
FCLE
FCRE
B. Roof Frame
Parts needed for each extension:
(2) RS3 Roof Structure Short (RS3SB)
(2) RS4 Roof Structure (RS4E)
(1) RS6 Roof Structure (RS6E)
(1) RS7 Roof Structure (RS7E)
(1) RS11 Roof Structure Support (RS11E)
(2) Middle Column Fitting (FMC)
CB2E
CB3SB