Use and Care Manual
Parts Needed:
(4) Corner Column (CCB)
(1) Left Door Column (CDLB)
(1) Right Door Column (CDRB)
(4) Middle Column (CMB)
(7) Side Panels (SP )
(2) Front Side Panels (FSP )
(2) Front Center Band (CB1B)
(2) Side Center Band (CB2B)
(1) Back Center Band short (CB3B)
(1) Back Center Band long (CB3XB)
(2) Front cross center band (CB4B)
(1) Middle Joining Support (MJ)
(4) Center Band Fitting (FCB)
(1) Center Band Cover (CBC)
1.Slide right door column (CDRB) into the U-Channel
Base (B1RB) on the right side of the door. Line up
the pre-drilled holes on (CDRB) Column with pre-
drilled holes on U-Channel Base. Secure with two
(S1) screws from inside.
(See blowup detail fig.1)
4. Using a carpenters square, line up all corners.
Secure base to wood foundation using (S1) screws
B. Walls & Columns
All panels are clearly marked and care should be
taken to use the correct one.
2
EXTR
fig.1
S1
Inside
Note
B22
B1RB
CDRB
CDRB
B1RB
Parts Needed For Each Extension:
(2) Middle Column (CMB)
(2) Side Panels (SP )
(2) Back Center Band long (CB3LB)
Right
CDRB
Concrete foundation
4b. Shed or shed foundation should be placed
on concrete footing by use of anchor bolt and nut.
Using a carpenters square, line up corners. Align
U-Channel base, mark the concrete through the
holes in the base and drill concrete with 1/2” (dia.
12.5mm) concrete bit to accept anchor bolts to a
1 3/4” (44mm) depth. Replace base and secure
with 1/4” x 1 1/2” (M6 x 40mm) anchor bolts.
(not provided)