Use and Care Manual

Parts Needed:
(4) Corner Column  (CCB)
(1) Left Door Column  (CDLB)
(1) Right Door Column  (CDRB)
(4) Middle Column  (CMB)
(7) Side Panels  (SP )
(2) Front Side Panels  (FSP )
(2) Front Center Band  (CB1B)
(2) Side Center Band  (CB2B)
(1) Back Center Band short  (CB3B)
(1) Back Center Band long  (CB3XB)
(2) Front cross center band  (CB4B)
(1) Middle Joining Support (MJ)
(4) Center Band Fitting  (FCB)
(1) Center Band Cover  (CBC)
1.Slide right door column (CDRB) into the U-Channel
Base (B1RB) on the right side of the door. Line up
the pre-drilled holes on (CDRB) Column with pre-
drilled holes on U-Channel Base. Secure with two
(S1) screws from inside.
(See blowup detail fig.1)
4. Using a carpenters square, line up all corners.
Secure base to wood foundation using (S1) screws
B. Walls & Columns
All panels are clearly marked and care should be
taken to use the correct one.
2
EXTR
fig.1
S1
Inside
Note
B22
B1RB
CDRB
CDRB
B1RB
Parts Needed For Each Extension:
(2) Middle Column  (CMB)
(2) Side Panels  (SP )
(2) Back Center Band long  (CB3LB)
Right
CDRB
Concrete foundation
4b. Shed or shed foundation should be placed
on concrete footing by use of anchor bolt and nut.
Using a carpenters square, line up corners. Align
U-Channel base, mark the concrete through the
holes in the base and drill concrete with 1/2” (dia.
12.5mm) concrete bit to accept anchor bolts to a
1 3/4” (44mm) depth. Replace base and secure
with 1/4” x 1 1/2” (M6 x 40mm) anchor bolts.
(not provided)