Use and Care Manual
23. Attach the center band (CB1B) to door
column, corner column and center band (CB2B).
See figures 1 and 2.
21. Insert the side panel (FSP ) into the groove
of column (CCB). Start at the bottom with panel at
an angle then push into place.
22. Slide door column (CDLB) into the U-Channel
Base (B1LB) on the left side of the door. Line up
the pre-drilled holes on (CDLB) Column with pre-
drilled holes on U-Channel Base (B1LB). Secure
with two (S1) screws from inside.
(see blowup detail).
12
CDLB
CCB
CB1B
Inside
CCB
B1LB
CDLB
B1LB
S1
CDLB
Fig.2: Use
(S1) screw.
Fix (CB1B) to
(CDLB)
CDLB
CB1B
B1LB
2
1
FSP
Note
After completing the center band assembly fully tighten
the four center band fittings (FCB) to the corner column
(CCB).
CDLB
Fig.1: Use (S1) screws.
Fix (CB1B) to
(FCB) and (CB2B).
CB2B
CB1B
FCB
SP
Inside
CCB
B1LB
B1LB
CCB
FSP
FSP
S1
S1