Instructions / Assembly
las place panels into frame at an
angle on top and slide in sideas and
donard for eas insertion.
2. Insert te front side anel (FP ) into te roove
of column (CRB). Start at te bottom of te anel at
an anle ten s into lace.
utside
1
3. Slide corner column (CCB) into side anel
(FP ) sin te colmn to te side anel.
4. orin otside se 1 scres to secre
colmn to bases (B1RB) and (B2B).
ote
ake sure panels are right side up
ith panel shingles facing don.
Check the stamped label on top.
of all panels.
ote
CCB
B1B
B2B
F
Inside
F
C
B1B
CB
CB
F
F
CCB
Inside
F
CCB